MK

We were chosen to install ADC Krone Category 6 LSOH outlets at Network Rails' new corporate offices in Milton Keynes Central Station.
The project was completed on time, and on budget within 13 weeks.

  • 3,000 Category 6 Outlets over two floors
  • 216 Category 6 Links within and between LAN Rooms
  • 6 OM3 24 Core Fibre Optic Links between LAN Rooms
  • 2 OM3 16 Core Fibre Optic Links between LAN Rooms
  • TV Distribution System
  • 18 Comms Cabinets
  • Full Patching of Cabinets and Desks on both floors
  • Installation of 400 Monitors on Desks
  • Installation of Time Display Equipment

The fourth floor consisted of 1,400 Category 6 outlets, and the third floor was 1,600 Category 6 outlets with 48 Category 6 links and fibre optic between north and south core LAN rooms. We installed Category 6 and fibre optic links between the third and fourth floors.
Within the 13 week time frame we also installed a TV distribution system for the two floors, 
time display equipment, mounted 400 monitors on desks, patched all required outlets, and installed Category 6 outlets to the ground floor reception area.

MK
MK
MK